Blog · OEM Sourcing Guide

Five Clauses to Put in an OEM Appliance Contract

An OEM order rarely fails on price. It fails on the clauses nobody wrote down: who owns the tooling, what AQL you agreed, how many spare parts ship with the container, and who pays when a pallet arrives dead on arrival.

An OEM order rarely fails on price. It fails on the clauses nobody wrote down: who owns the tooling, what AQL you agreed, how many spare parts ship with the container, and who pays when a pallet arrives dead on arrival. These five clauses are the difference between a repeat customer and a write-off.

1. Tooling: who pays, who owns it, when is it refunded

Write three things: the amount, the ownership, and the refund trigger.

Our model is explicit because ambiguity here is the most common source of disputes: custom tooling is paid by the customer, ownership transfers to the customer, and the amount is refunded once the agreed cumulative volume is reached. The volume that triggers the refund is written into the quotation itself, not agreed verbally later. If a supplier will not put the refund volume in writing, treat the tooling fee as a sunk cost and price it into your margin.

2. AQL and inspection: name the standard, name the sampler

"Good quality" is not a clause. Use AQL sampling with a stated level (critical / major / minor defects), state who inspects — factory QC, your own QC, or a third party such as SGS, TÜV or Bureau Veritas — and state when: during production, before packing, or on loading.

Ask what the factory's own QC actually looks like. Ours is a four-step process: incoming component check, in-line assembly check, 100% functional test before packing, and a final random audit on the finished batch. That is what "4-step QC" means on our pages; it is not a slogan, it is a sequence you can audit on a factory visit.

3. Spare parts ratio: agree the percentage, not the promise

Portable cooking appliances fail in the field on a handful of parts: the control board, the coil, the glass-ceramic plate, the cord set and the fan. Agree a spare parts ratio per model per order — commonly 1–2% of the order quantity for boards and coils — and agree the price of those parts for two years after the last shipment.

Without that line, a distributor's first warranty season turns into a negotiation where the factory holds all the leverage, because replacement boards are not on any price list.

4. Warranty and DOA: split the cost by who can see the failure

Write two numbers, not one. DOA (dead on arrival) is usually handled by credit or free replacement on the next shipment, because the failure is visible on unboxing and easy to evidence. In-warranty field failure is different: it needs a fault report, a serial number and a return path. Agree who absorbs freight in each case.

A workable split for most importers: factory covers parts, importer covers local labor and freight, and both sides review the failure rate after each container. Anything vaguer than that ends in a discount demand at the worst possible moment.

5. Late delivery: a date, a grace period, and a remedy

Our quoted lead time is 35–40 days after deposit and artwork approval at 1,000 pcs per model, FOB Nansha. A contract should convert that window into: a confirmed ship date, a grace period, and a remedy — typically a percentage of the order value per week of delay, capped, or the right to cancel the balance.

Two things make the date realistic rather than aspirational: artwork approved before production starts, and certification testing running in parallel with tooling. If a supplier quotes 25 days and the certificate is not yet in hand, the date is fiction.

The clause nobody writes, and should

Change control. One line — "any change to specification after deposit restarts the lead time from the date of written approval" — prevents the endless slippage that happens when a buyer keeps adjusting the panel colour or the packaging artwork mid-production. It protects both sides: you get a real date, the factory gets a stable plan.

If you are comparing two or three Chinese suppliers, send the same five-clause table to each and compare the answers line by line. The one that answers in specifics, in writing, before you pay anything, is the one worth a factory visit.