Most rework on an export order does not come from the factory. It comes from a spec that was never pinned down: 220V or 230V, Schuko or Type G, CE or UKCA, and what happens in the markets where we do not hold the certificate. Fix those four lines before tooling starts and the rest of the project is mechanical.
Why this has to be settled before the deposit
Voltage and plug type decide the PCB, the coil, the cord set and the rating label. Change them after tooling and you are not editing a document, you are re-cutting a housing and re-running certification. On a 1,000 pcs per model order, that single mistake can cost more than the tooling itself.
The practical rule we use with importers: one model, one market, one certificate set. If a buyer wants the same model in three markets, plan three SKUs with three rating labels, not one label with three stickers.
The matrix we fill in with every buyer
| Market | Nominal voltage | Plug / socket | Marks we cover | What the buyer usually handles |
|---|---|---|---|---|
| EU (DE, FR, NL, PL, ES, IT...) | 230V | Schuko (C/F), Euro plug for small appliances | CE (LVD + EMC), RoHS, ErP | National language manuals, EPR / packaging registration |
| UK | 230V | Type G (BS 1363) | UKCA, plus CE for stock already in EU channels | UK responsible person, WEEE registration |
| Gulf (UAE, KSA, QA, KW) | 230V | Type G or C, country-dependent | CE and CB test reports as the technical base | SASO / G-mark where required, Arabic labeling |
| South & Southeast Asia | 220–230V | Type C / G / A mix | CB reports; CE where the channel demands it | Local standards registration (e.g. BIS, TISI) — not ours |
| Latin America | 127V or 220V, country-dependent | Type A / B / I / L | CB reports; CE for EU-bound stock | INMETRO, NOM, IRAM and similar national schemes |
| North America | 120V | NEMA 5-15 | Not covered by us | UL / ETL listing and 120V platform — quote as a separate project |
Two columns matter more than they look. "Marks we cover" is what we pay for and test for: CE (LVD + EMC), CB, RoHS, ErP and UKCA. "What the buyer usually handles" is everything outside that set — and it is not a courtesy line, it is a cost line. Local schemes such as SASO, BIS, INMETRO or UL are separate certifications with separate labs, timelines and fees; we do not bundle them into the unit price, because pretending they are free is how projects blow up in month four.
The four lines to write down before tooling
Send this back in one message and the quote stops being approximate:
- Voltage and frequency — 230V/50Hz for EU and UK; confirm per country for LatAm and the Gulf.
- Plug type and cord length — with the standard you are testing to (BS 1363, EN 50075, etc.).
- Certificate set — which marks must appear on the rating label, and which market schemes you will register yourself.
- Label and manual language — the language on the box is part of the artwork, not something to add later.
What this changes in the schedule
Once those four lines are fixed, our standard path is: sample in 2–3 working days for stock models, about one week for a configured sample, then 35–40 days after deposit and artwork approval for bulk at 1,000 pcs per model, FOB Nansha. Certification testing runs in parallel with production tooling, not after it — that is the only way the 35–40 day window holds.
Where importers get caught
1. Treating CB as a market certificate. CB is a test-report base that national schemes accept; it is not a mark you can put on the product for every country.
2. One label for three markets. A sticker over a printed rating label is the fastest way to fail an incoming inspection.
3. Assuming the factory handles local registration. EPR, WEEE and packaging registration are importer obligations in most of the EU. We can supply the documents; the registration is yours.
If you already have a target market and a target retail price, send both. We will tell you which of the four lines is likely to move the cost, and which are fixed by the standard.