WECHGOOD Get a Quote
WECHGOOD · Foshan Factory

How to Choose an Induction Cooker Supplier in China

Choosing an induction cooker supplier in China comes down to seven checks: manufacturing depth, certification coverage, minimum order quantity, sample and tooling lead times, quality control at the PCB and assembly stage, export documentation, and whether the supplier can carry your brand long term. Suppliers that pass all seven can support repeat orders; suppliers that fail one of them usually show it before the first shipment, not after.

The seven-point screening checklist

CheckWhat to verifyWarning sign
1. Manufacturing depthWhether the supplier assembles from purchased kits or controls coil winding, PCBA and final testing in-house.Cannot explain where the PCB or induction coil is produced, or refuses a video walkthrough of the line.
2. Certification coverageCE and UKCA for the EU and UK, ErP for energy labelling, plus RoHS, LVD and EMC reports that name the exact model you are buying.Certificates list a different model number, or are issued to a trading company rather than the manufacturer.
3. Minimum order quantityMOQ per model and per voltage variant, and whether mixed models can be combined in one order.MOQ quoted per container only, with no smaller trial order path.
4. Sample and tooling lead timeReady-stock samples versus customised samples, and the time needed for your logo, packaging and rated voltage.Lead time quoted without asking about voltage, plug type or packaging.
5. Quality controlIncoming component checks, functional test before packing, and aging or burn-in test on a sampled basis.Only a final visual check, with no electrical safety test record.
6. Export documentationCommercial invoice, packing list, HS code for induction cookers, and experience with the destination market requirements.Cannot state the HS code, or has never shipped to your market.
7. Long-term brand supportWhether tooling, packaging artwork and product changes stay with you across repeat orders, and who pays for the mould and on what refund terms.Tooling ownership is unclear, or the supplier renames models between orders.

Order terms you should expect

ItemTypical terms
MOQ1,000 pcs per model for both trial and volume orders.
Production lead time35–40 days after sample approval and deposit.
Stock samplesDispatched in 2–3 days for models held in stock.
Customised samplesAbout one week for logo, packaging or voltage changes.
PriceQuoted per model and wattage, based on certification package and packaging specification. Prices move with copper and IGBT cost, so confirm on the quotation rather than on the catalogue.
ToolingFor a custom-developed model the mould fee is paid by the customer: either paid once, or paid first and refunded once the agreed cumulative quantity is reached. The refund threshold is written into the quotation, so it is a term, not a verbal promise.
CertificationCE, CB, RoHS and ErP are carried by WECHGOOD as part of the base package; certifications outside that set are quoted separately when your destination market requires one, so the quotation shows what is included and what is not.

Certifications that decide whether your shipment clears customs

Ask for the certificate number, the issuing laboratory and the model list, not just a PDF cover page. A supplier that can produce all four on request is usually the one that has already shipped to your market.

Common questions buyers ask

Is it cheaper to buy through a platform or directly from a factory?

Platform listings are easier to compare, but the quotation often comes from a trading company. Buying directly from a factory removes one margin layer, provided you verify manufacturing depth against the checklist above.

Can I start with a small order?

Ask for a trial order at the standard MOQ and use it to check packaging, voltage labelling and out-of-box quality before committing to container volume.

How long does a first production run take?

Plan for sample confirmation first, then production. Customised samples take about a week; volume production runs 35–40 days after the sample is approved in writing.

What should a factory visit cover?

The PCBA line, coil winding, assembly, the test bench and the packing area — in that order. If one of these is outsourced, ask who the subcontractor is.

Sourcing terms at a glance

The same figures appear across every page of this site, so you can quote them when comparing suppliers.

ItemWECHGOOD terms
MOQ per model1,000 pcs
Samples1 pc; stock models ship in 2–3 days, customised samples in about a week
Lead time35–40 days after deposit
Base certificationsCE / CB / RoHS / ErP / UKCA
Factory18,000+ m² self-owned plant, Ronggui, Shunde, Foshan, Guangdong
Capacity5 production lines, 300+ workers, 15,000 pcs/day — 450,000 pcs/month
Burn-in2–4 hours on every batch
Reliability aging1,000 hours on qualification units
ToolingPaid by the buyer, rebated once the agreed volume is reached
Business modelManufacturer, OEM / ODM

Related sourcing guides

Next step

Send your market and volume, get a matched quote

Tell us your target market, wattage range and annual volume. We will reply with the matching models, the certificate list and the MOQ for your configuration.