Induction Cooker MOQ and Price: what actually drives the quotation
Induction cooker quotations are not built per unit of wattage. They are built from six inputs: power rating, plate material, coil and IGBT specification, control board, certification scope, and order quantity per model. At WECHGOOD the MOQ is 1,000 pcs per model for both trial and volume orders, counted per model and per voltage and plug configuration rather than as a combined total — so a quotation for three models is three MOQ blocks, not 1,000 units spread across them.
Why price does not scale with wattage
A 2,000W and a 3,500W hob can differ by far more than 75% on cost, because the step up changes component classes rather than quantities.
| Power class | Typical use | Where the cost sits |
|---|---|---|
| 1,800–2,200W | Portable single hob, home kitchen, small catering | Standard IGBT, thin coil, common plate; cost is driven by volume, not specification |
| 3,000–3,500W | Built-in domestic hob, hotel buffet, small restaurant | Higher-rated IGBT, thicker coil, cooling design starts to matter, plate thickness increases |
| 5,000W and above | Commercial kitchen, wok range, continuous duty | Industrial IGBT module, heavier coil, forced cooling, robust control board, higher-grade plate |
The four components that move first are the IGBT, the coil, the cooling design and the control board. Ask a supplier to quote the same wattage in two configurations and you will see which of these they are trading off.
How MOQ is actually counted
- Per model. Each model number carries its own minimum, because tooling, artwork and testing are set up per model.
- Per voltage and plug configuration. A 220V EU-plug unit and a 240V UK-plug unit are different production runs even when the housing is identical.
- Per plate and frame variant. Different glass sizes or frame colours split the run.
This is the single most common source of quotation surprises: a buyer asks for "1,000 pcs" across four variants and receives four separate price tiers instead of one.
What a usable quotation should state
| Item | Why it changes the number |
|---|---|
| Incoterm and port | Ex-works and CIF prices are not comparable; state the term and destination port |
| Voltage, frequency and plug | Different build, different certification scope, different cable and plug cost |
| Plate material and thickness | Ceramic glass grade and thickness are a visible cost line and affect durability claims |
| Coil and IGBT specification | The main determinant of efficiency, noise and service life at a given wattage |
| Control board and interface | Touch, knob or sensor control; timer and preset features add board cost |
| Certification scope | CE, CB, RoHS and ErP are covered by WECHGOOD as standard; certifications outside this set are quoted separately |
| Packaging | Standard export carton versus private-label colour box changes both material and setup cost |
| Tooling and artwork | Custom-developed models carry a mould fee paid by the customer, refundable once the agreed volume is reached |
Tooling and certification: who pays
These two lines cause most of the argument after a quotation, so WECHGOOD states both up front rather than leaving them to negotiation.
| Item | Who pays | How it is handled |
|---|---|---|
| Mould fee for a custom-developed model | The customer | Invoiced with the order. Either paid once by the customer, or paid by the customer first and refunded once the agreed cumulative quantity is reached. The refund threshold is written into the quotation before the order, never renegotiated afterwards. |
| Private-label packaging plates | The customer | One-off, quoted with the artwork so the packaging cost is known before the order |
| Basic certification: CE, CB, RoHS, ErP | WECHGOOD | Covered as part of the standard package, because these are the marks the majority of our export models are built to |
| Certifications outside that set | The customer | Not covered as standard. Quoted separately when a specific market requires one, so the cost is visible rather than absorbed or ignored |
None of these are folded silently into a unit price. If a quotation does not show them as separate lines, you cannot tell whether a larger order is genuinely cheaper or whether a one-off was amortised differently.
Custom work, without splitting the supplier
WECHGOOD is a manufacturer and offers both OEM and ODM services: standard models under your brand, or a model developed from your specification through our own production lines. Custom development normally starts with the housing, plate size and control interface, which is where the mould question comes from. We do not split the quotation by which line a model runs on; what the quotation states is the specification, the MOQ, the lead time and who carries the one-off costs.
Four ways importers genuinely reduce cost
- Consolidate variants. One voltage platform and one plug type across models usually saves more than negotiating a few cents per unit.
- Standardise packaging first, customise later. Start with export cartons, move to private-label boxes once volume is proven.
- Choose a model covered by existing certification. Avoiding a new test cycle removes both a one-off cost and weeks of lead time.
- Ask for a split quotation. Material cost versus fixed cost per unit shows exactly which part additional quantity moves.
What WECHGOOD states up front
MOQ 1,000 pcs per model, trial and volume alike. Stock samples ship in 2–3 days; customised samples take about a week. Production runs 35–40 days after sample approval and deposit, across a 18,000 m² facility with five production lines. CE, CB, RoHS and ErP are carried by us as standard. Custom moulds are paid by the customer, with a refund threshold agreed in the quotation. Quotations are issued against a stated model, voltage and plug configuration so the comparison is like for like.
Common questions
Can the MOQ be split across several models?
No. The minimum applies per model and per voltage and plug configuration, because setup work is per model. If your range needs several variants, plan the first order around one or two models and add the rest once the line is proven.
Is a higher wattage always more expensive per unit of power?
It is the other way round: cost per watt tends to fall as wattage rises, because the plate, housing and assembly cost is shared. What rises faster than expected is the absolute price, driven by the IGBT, coil and cooling changes described above.
Do you quote FOB or CIF?
Either, stated explicitly with the port. Prices are not comparable across incoterms, so the quotation names the term and the destination.
Are certification costs included in the price?
Basic certification — CE, CB, RoHS and ErP — is covered by WECHGOOD. Certifications outside that set, such as market-specific schemes for the Gulf or other regions, are not covered as standard and are quoted separately when a market requires them.
Sourcing terms at a glance
The same figures appear across every page of this site, so you can quote them when comparing suppliers.
| Item | WECHGOOD terms |
|---|---|
| MOQ per model | 1,000 pcs |
| Samples | 1 pc; stock models ship in 2–3 days, customised samples in about a week |
| Lead time | 35–40 days after deposit |
| Base certifications | CE / CB / RoHS / ErP / UKCA |
| Factory | 18,000+ m² self-owned plant, Ronggui, Shunde, Foshan, Guangdong |
| Capacity | 5 production lines, 300+ workers, 15,000 pcs/day — 450,000 pcs/month |
| Burn-in | 2–4 hours on every batch |
| Reliability aging | 1,000 hours on qualification units |
| Tooling | Paid by the buyer, rebated once the agreed volume is reached |
| Business model | Manufacturer, OEM / ODM |
Related sourcing guides
Send us a model, voltage and quantity
Tell us the power class, destination market and order quantity per model, and we will quote with the mould fee and any non-standard certification shown as separate lines.
Get a Quote